Quality Norwood GA septic system installers do a great deal of legwork, long before a unit gets put into the ground. A brand new unit will last years, and possibly even generations, if it’s placed correctly, but it can malfunction right away if it’s not. Additionally, all Norwood GA septic system installers must acquire a permit for them to execute the install, and may will have to collaborate with city or county officials to show that specific tests were performed in order to proceed. These three evaluations are necessary primary steps that should always be taken before any job or designs are done, and it may also be advantageous to accomplish them before you acquire a property, so you can be assured that a tank and leach field will be permitted.
1. Pit
The pit test is pretty straightforward. In the course of this test, a hole is dug and the soil is analyzed to figure out its composition. A conventional leach field is reliant on the soil’s composition to drain efficiently. If there is a considerable amount of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a bunch of clay or rock, it won’t sink well, therefore a traditional leach field will not be an option. If the location you’ve picked does not successfully pass the pit test, you may be able to choose another site on your home or use an alternate type of drain field, such as a mound system.
2. Perc
The perc, or percolation test, requires digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is generally left soaked for about two hours, and topped off as needed. After this, the hole is filled with 6 inches of water and monitored for water drainage.
3. Visual
There are many things an inspector will look into visually. Most units are gravity-fed, so they don’t rely upon electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the slope of the ground is essential. An inspector will also try to find slopes that could possibly feed excessive water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Enlist the Services of Quality Norwood GA Septic System Installers Today
Picking the right configuration, type of system, and evaluating the land correctly, are all important procedures in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done properly, so that a system provides years of use without issue. If you’re prepping for an install, contact Septic Tank Pros Augusta GA. Our partner service technicians are knowledgeable and dedicated to quality, so you can be sure the job is done right. Call (706) 204-1717 today.