3 Evaluations Quality Bartow GA Septic System Installers Perform Before Designing

Posted on: November 27, 2017 by in Septic System Installers
No Comments

Bartow GA Septic System Installers, septic tank install Bartow GA, septic tank installation Bartow GA, septic system install Bartow GA, septic system installation Bartow GA

Quality Bartow GA septic system installers do a number of legwork, long before a unit gets placed into the ground. A new unit will last years, and possibly even generations, if it’s placed the right way, but it can break down immediately if it’s not. Additionally, all Bartow GA septic system installers must secure a permit in order to carry out the install, and may ought to collaborate with city or county officials to show that a number of tests were performed in order to progress. These three evaluations are important initial steps that should always be taken before any job or designs are done, and it may also be advantageous to do them before you acquire a property, so you could be assured that a tank and leach field will be allowed.

1. Pit

The pit test is very uncomplicated. In the course of this test, a hole is dug down and the soil is analyzed to determine its structure. A typical leach field is dependent on the soil’s structure to drain successfully. If there is a bunch of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a lot of clay or rock, it won’t drain well, therefore a standard leach field will not be an option. If the site you’ve chosen does not successfully pass the pit test, you may be able to select another site on your home or use an alternate type of drain field, like a mound system.

2. Perc

The perc, or percolation test, calls for excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is normally left soaked for about two hours, and topped off as needed. After this, the hole is filled with 6 inches of water and observed for water drainage.

3. Visual

There are many things an inspector will check visually. Most units are gravity-fed, so they don’t depend on electricity or pumps to transfer effluent from the tank to the leach field. As a result of this, the slope of the ground is crucial. An inspector will also seek out slopes that could possibly feed excessive water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.

Enlist the Services of Quality Bartow GA Septic System Installers Now

Selecting the right layout, kind of system, and evaluating the land properly, are all integral steps in making sure an install goes off without a hitch. Most significantly, these steps guarantee that the install is done correctly, so that a system provides decades of use without problems. If you’re preparing for an install, call Septic Tank Pros Augusta GA. Our partner professionals are experienced and committed to quality, so you can be sure the job is done right. Call (706) 204-1717 today.

Comments are closed.

Submit your review
1
2
3
4
5
Submit
     
Cancel

Create your own review

Average rating:  
 3 reviews
 by Phil Glover on Septic Tank Pros Augusta GA
Great Service

Competent and quick in assessing the situation. They were able to solve my problem. I'm very pleased with the quality of service, and won't hesitate to call on them in the future. Good job guys, thanks!

 by Lola Mccallister on Septic Tank Pros Augusta GA
Two Thumbs up for the PROS!

Two thumbs up! You guys were very accomodating and great!! Keep up the good work you do. I really appreciate your help. Thank you so much!

 by D Hughes on Septic Tank Pros Augusta GA
Great Service

Reliable group of pros!

MEDIA







Septic Tank Install





Septic Systems Install





Septic System Service





Septic Repair